Home
Gallery
Beach House
Beach House Construction
Our lot in Jamaica Beach, TX
WP_20140512_11_33_26_Pro
30' long 12x12 pressure treated pilings
WP_20150114_12_11_16_Pro
First, they drill a hole for a piling
WP_20150114_13_57_19_Pro
Then the piling is lowered into the hole
WP_20150114_16_43_34_Pro
The forms are set for the slab. The top of the slab will be at 8 feet above sea level.
WP_20150130_11_09_41_Raw
The workers construct scafolding from the remains of the concrete forms. This allows them to notch the pilings and run the stringers and joists.
V__216A
First floor framing, as seen from the street.
WP_20150218_16_33_03_Raw
The joists holding the first floor. This will be insulated and enclosed.
WP_20150218_16_34_32_Raw
First floor framing, as seen from the beacj side of the house.
WP_20150218_16_35_42_Raw
The storage area will be totally enclosed.
WP_20150218_16_37_15_Raw
The view from the first floor. You can see a bit of the Gulf of Mexico between the houses. The second floor should have a great view of the Gulf.
WP_20150219_09_25_19_Raw
Home
Photo Gallery
Travel Blog
Projects
Beer Tab Armor
About
Contact
Search
Home
Photo Gallery
Travel Blog
Projects
Beer Tab Armor
About
Contact
Search